
Infrastructure
Charging Stations That Open With Demand Already Confirmed
Every vehicle E-Mobilite finances is contractually required to charge at an E-Mobilite station — solving the chicken-and-egg problem of EV infrastructure from Day 1.
Net revenue per day per station at full capacity
Stations targeted nationwide by end 2027
Of the time the Nigerian grid can lose a phase — our system keeps charging through it
Target Corridors
Stations are sited on major interstate transport corridors, standalone and separate from petrol forecourts for fire safety.
Abuja – Kaduna
2 stationsActive build-out
Lagos – Ibadan
2 stationsActive build-out
Abuja – Kano
3 stationsPhase 5

Station Parameters
Solar contributes 60% of charging energy, cutting reliance on grid power that loses phase 50–90% of the time in Nigeria.
Partner With Us
Finance, Lease, or Deploy an EV With Us
Whether you’re a fleet operator, logistics platform, investor, or individual driver — E-Mobilite finances the asset so you can focus on the road.
Get In Touch